wp4d3cffcb_0f.jpg

Termex cellulose insulation warmcell exell excell paper wood recycled re-cycled re cycled reclaimed re claimed re-claimed newsprint sustainable ecofriendly eco friendly eco-friendly green bpi building product index cheap cost effective installers scotland england wales north yorkshire york easingwold

wp15a503e3.png

Copyright TERMEX UK Ltd

Web Design by GODAROMX.co.uk

The Installation Process:

The installation of termex is very quick and waste effective. Termex is installed by the use of our unique workhorse, where bales are fluffed and introduced to a water/glue solution. As such we have our own trained operators to install the product.

* It is essential that a reliable 240V 13amp electrical supply is available on site for the equipment to be linked to.

Below is a three stage example of blowing termex insulation into a timber-frame partition.

* To download the the videos, right-click on the video-reel to the right of each stage, select Save Target As.., and then choose a directory on your computer. They make take a some time.

             Stage 1 - The Wall Application Stage: Termex is simply blown into the                timber-frame partitions. .
          Stage 2 - The Cut & Face Stage: A special roller is used to cut and                      face the material to the depth of the timber-frame, leaving a flush finish               and eliminating cold spots.
         Stage 3 - Recycling / Cleanup Stage: The deposited material that                         has fallen to the floor can be sucked up by the workhorse. The reclaimed            material can be pumped to other locations within a building, such as the                loft, leaving no waste.
wp699100d0_0f.jpg
wp58854f6f_0f.jpg
Video1.gif
Video1.gif
Video1.gif